We lead the construction
industry in quality control

No more stumbling blocks. Constructing flawless buildings is now easier
than ever.


See how it works
 

Quality data to everyones.

[mpc_tabs tabs_h_align=”center” padding_divider=”true” mpc_button__preset=”default” mpc_button__font_preset=”default” mpc_button__font_color=”#555555″ mpc_button__font_size=”16″ mpc_button__font_transform=”uppercase” mpc_button__border_css=”border-width:2px;border-color:#e5e5e5;border-style:solid;border-radius:0px;” mpc_button__padding_divider=”true” mpc_button__padding_css=”padding-top:12px;padding-right:30px;padding-bottom:12px;padding-left:30px;” mpc_button__hover_font_color=”#333333″ mpc_button__hover_background_color=”#e5e5e5″ mpc_button__hover_background_effect=”slide-top” button_margin_divider=”true”][mpc_tab title=”Tab 1″ tab_id=”1568678147-1-7″]
  • BIM coordination
bim-coordination
  • Construction
construction
  • Design
designer
BIM Coordination – Quality Assurance
for Your BIM Projects
Find issues early on

Combine models from different disciplines and run highly advanced checks on the federated model against BIM requirements and regulations, going way beyond simple clash detection.

Coordinate and communicate

Provide all the involved parties, both in the office and on-site, consistent and validated data throughout the project. Map, visualize and report data and assign issues easily.

Find issues early on

Ensure leading-edge quality control in your BIM processes with flexible, rule-based model checking to meet the toughest QA/QC needs and to support your entire end-to-end workflow.

[/mpc_tab][mpc_tab title=”Tab 1″ tab_id=”1568681308489-10″]
  • BIM coordination
bim-coordination
  • Construction
construction
  • Design
designer
Construction – Better Data for Better Builds
Minimize errors beforehand

Work with quality-controlled BIM models and information that is always correct and up-to-date. Eliminate on-site surprises and focus on the actual construction or manufacturing.

Take off more than just quantities

Cut overspend with accurate and always up-to-date takeoffs which extract just the information you need directly from the validated model, and easily visualize and report any data you need.

Communicate with the design team

Spend less time revising and going through late fixes. Enjoy a seamless information flow between the office and site teams and ensure everyone is on the same page throughout the project.

[/mpc_tab][mpc_tab title=”Tab 1″ tab_id=”1568681316883-8″]
  • BIM coordination
bim-coordination
  • Construction
construction
  • Design
designer
Design – An Ode to Better Designs
Correct prior to delivery

Ensure your brilliant design is of the top-notch quality by checking and correcting it before delivery. Free your time from late fixes and build a reputation as the designer of quality work.

Check against requirements

Be confident that your design is compliant with BIM requirements, regulations, and internal quality standards. Provide consistent, validated and quality-assured geometry and data.

Align with other disciplines

Compare model iterations, coordinate your design and clash check with other discipline models. Gain all the benefits of IFC, OpenBIM and seamless integration to CDEs.

[/mpc_tab][/mpc_tabs]

Build impeccably. No more hiccups. Effortless success.

You want to build impeccably, and minimize cost and time. With Solibri, you won’t have to worry about the obstacles along the way.


Download the Trial
Screenshot 2019-09-16 at 16.01.04

Combine

Screenshot 2019-09-16 at 16.01.10

Classify

Screenshot 2019-09-16 at 16.01.15

Check

Screenshot 2019-09-16 at 16.01.19

Communicate

Latest news.



The N#1 Model Checking
Choice at

Start building better today.